Press - News
Archive
Press - News
Archive
Press - News
Archive

On August 26th, 2009 Mostostal Pulawy S.A. signed a contract with Strabag Sp. z o.o. on production, supply, assembly and anticorrosive protection of steel structure of a MS-5 bridge over the River Wieprz.

 

This bridge is being built in connection with the building of an expressway No. S19, the section Międzyrzec Podlaski – Lubartów.

Investor: General Management of Domestic Roads and Speedways, Dep. in Lublin, Poland.

The designed object will be simple in its architectural form.

Total weight of steel structure to be produced and assembled is 910 T, the bridge will be 222,09 meters long and 13.20 meters wide.

Total gross value of the contract is about 10,065 mln PLN and the realization period is from December 2009 till July 2009.