Press - News
Archive
Press - News
Archive
Press - News
Archive

Bridge constructing in Przemyśl

On 14th October 2010, Mostostal Puławy company made a deal with the Mota-Engil Central Europe S.A. company to manufacture and carry out the steel construction of bridges altogether with their corrosion prevention, transport and installation regarding to the eastern ring road of Przemyśl. The Przemyśl district authorities are the investors of this venture.

The above mentioned investment is located in the eastern part of the city  with characteristic residential buildings.

The first construction-  the Main Bridge- is attached to the pylon located on the eastern  river bank. Nearby the bridgehead, there is an underground building dating back to 1853. The next construction is a flyover  located over E. Plater Street, heating main and  the 91 number railway joining the cities of Cracow and  Medyka. This flyover is divided into two independent bridge constructions.

The weight of this construction is 3000 tons. The length- 529,45 meters (226,8m+229,45m+73,20m). The deadline is October 2010- June 2012.

Bridge constructing in PrzemyślBridge constructing in PrzemyślBridge constructing in Przemyśl