- Details
The second phase of the assembly of industrial gases installation equipment for Air Liquide has begun. This investment is performed in the area of Zakłady Azotowe Pulawy S.A. The scope of work includes the assembly of seven 70÷162 ton weight installation assembly segments. All works connected with joining of these installation assembly segments with the piping system are now in final stage. The assembly of the installation should be finished in the second quarter of 2010.
- Details
On January 28th, 2010 the business magazine Forbes has published a Raport “ Forbes’ Diamonds 2010”. The polish companies with the most dynamic increase of their value in years 2006-2008 were placed in the 4th edition of the ranking. Mostostal Puławy was honoured with this significant title in the mid-size companies category with the income from sales coming to 50-200 mln zlotys.
- Details
After almost 2 years of construction works, on October 13th, 2009, the National Inspector of Building Control for Bydgoszcz City has issued a Investment Usage Allowance for "The extension of the TDI complex to 75tt / per year" in Zachem S.A. The successful performance of the trial starting allow to sign on December 08th, 2009 "The final protocol of investment’s commissioning" and initiate the production of TDI by the modernized installation in ZACHEM S.A. In that moment the biggest contract in history with Mostostal Puławy S.A. as a General Contractor of the Investment has come to the end.
- Details
On December 4th, 2009 in Congress Centre of University of Life Sciences in Lublin there has been held the Business Forum 2009 and the gala of the Lublin Business Club Association. Among the invited 400 guests there were: the members of the Associastion, representatives of local authorities, representatives of diplomacy, media, businessmen, artists and other significant guests.
- Details
Mostostal Pulawy S.A. is currently assembling the equipment of industrial gases installation of new air separation plant in the area of Zakłady Azotowe Pulawy S.A. This investment contains the erection of equipment and industrial gases separation installation ( especially oxygen production) using the low-temperature method.