2007
- Details
For the thirteenth time the International Fair of Road Building Industry AUTOSTRADA-POLSKA took place in Kielce (from May 16th to 18th, 2007). The fair accumulated the biggest companies connected with road construction industry, traffic engineering and road safety. There was also Mostostal Pulawy among the exhibitors.
- Details
Being well known in the region as a patron of art, the Managing Board of Mostostal Puławy organized on May 11th 2007 an unusual concert of classical music titled “May meeting with music”.
- Details
On April 24th , 2007 Mostostal Pulawy S.A. made a contract with DURO DACOVIĆ Termoenergetska Postrojenia d o.o. on assembling of two boilers in the waste incineration plant in Pithiviers, France. Total weight of boilers is 375T. The works will be carried out till April 2008.
- Details
On March 1st, 2007 Mostostal Pulawy made a contract with DROMO Sp. z o.o. on production, assembly and anticorrosive protection of steel structure of a bridge over the River Pisa. Total weight of steel structure to be produced and assembled is 120 T and 1945qm of steel structure would be anticorrosive protected.
- Details
On February 12th -14th 2007 Mostostal Pulawy S.A. commenced the process of assembling steel elements of the right-hand side of the bridge over the River Vistula in Pulawy. It was here that, after long and demanding preparations, the operation of lifting and assembling one of the largest structural elements of the bridge was started.